Solar lights eliminates need for 2km cable
The installation of two solar-powered exterior lights at a railway crossing in Cambridgeshire has eliminated the need for a copper grid connection of 2 kilometres. Up to now Rampton Crossing, north of Cambridge, has lacked adequate lighting and was assessed as posing a ‘significant risk’ of...